Operating office: Via Comunità Carnica 7, 33029 Villa Santina UD . t. +39 0433 86075 . info@lumieimpianti.com

The power
of a custom-built
hydroelectric plant

read

Technology
for energy

read

Energy
for your future

read

Works > Hydroelectric power station Sostasio (UD)

Hydroelectric power station Sostasio (UD)
Pelton 464 kW

Located in Sostasio (PN), with an installed capacity of 464 kW: construction and installation of electromechanical equipment for the production workshop and the intake system.

Year of project

2016

Location

Sostasio (UD), Italy

Water

Description

4-jet horizontal-axis Pelton turbine

Net head (m)

136

Flow rate (l/s)

380

Turbine power (kW)

464

Lumiei Impianti guarantees the quality
of its installations at every level, from the smallest component
to the plant as a whole