Operating office: Via Comunità Carnica 7, 33029 Villa Santina UD . t. +39 0433 86075 . info@lumieimpianti.com

The power
of a custom-built
hydroelectric plant

read

Technology
for energy

read

Energy
for your future

read

Lumiei Impianti guarantees the quality
of its installations at every level, from the smallest component
to the plant as a whole

Design and construction

Turnkey formula for hydroelectric power plants designed and constructed by LUMIEI. The first stage is the feasibility study, based on the client’s needs and the morphology of the site. This is followed by a technical and financial report.

These are the criteria guiding the design and production process:

  • Automated unmanned operation
  • Careful determination of actual operating requirements
  • Simplified automated processes, thanks to coordinated design
  • High-quality components
  • High safety levels
  • Systematic testing of all mechanical and electrical parts and the command instrument components
  • Thorough tuning during start-up

Turbines are supplied pre-assembled and pre-tested, reducing overall project delivery times.

LUMIEI Impianti follows the same procedure when modernising existing plants and installs individual parts, such as the electrical system or the entire turbine unit.