Operating office: Via Comunità Carnica 7, 33029 Villa Santina UD . t. +39 0433 86075 . info@lumieimpianti.com
Works > Hydroelectric power station Sauris (UD), Italy
Hydroelectric power station Sauris (UD), Italy
Francis 220 kW
Located in Sauris (UD), with an installed capacity of 220 kW: construction and installation of electromechanical equipment for the production workshop and the intake system.
Year of project
2016
Location
Sauris (Ud)
Water
Description
Horizontal Francis turbine
Net head (m)
60
Flow rate (l/s)
440
Turbine power (kW)
220