Operating office: Via Comunità Carnica 7, 33029 Villa Santina UD . t. +39 0433 86075 . info@lumieimpianti.com
Works > Hydroelectric power station Rio Barman 2 (UD)
Hydroelectric power station Rio Barman 2 (UD)
Francis 550 kW
“Rio Barman 2” Hydroelectric Power Station in Resia (UD), with 550 kW installed capacity: construction of the entire electromechanical installation of the power station and the intake system
Year of project
2006-2008
Location
“Rio Barman” - Resia (UD), Italy
Water
Rio Barman river
Description
5-jet vertical-axis Francis turbine
Net head (m)
98,40
Flow rate (l/s)
1420
Turbine power (kW)
1250