Operating office: Via Comunità Carnica 7, 33029 Villa Santina UD . t. +39 0433 86075 . info@lumieimpianti.com

The power
of a custom-built
hydroelectric plant

read

Technology
for energy

read

Energy
for your future

read

Works > Hydroelectric power station Pamelouche (UD)

Hydroelectric power station Pamelouche (UD)
Pelton 800 kW

Located in Sauris (UD), with an installed capacity of 800 kW: revamping of the power station’s electromechanical works.

Year of project

2010

Location

“Pamelouche” - Sauris (UD), Italy

Water

Lumiei river

Description

4-jet vertical-axis Pelton turbine

Net head (m)

109,00

Flow rate (l/s)

950

Turbine power (kW)

800

Lumiei Impianti guarantees the quality
of its installations at every level, from the smallest component
to the plant as a whole