Operating office: Via Comunità Carnica 7, 33029 Villa Santina UD . t. +39 0433 86075 . info@lumieimpianti.com

The power
of a custom-built
hydroelectric plant

read

Technology
for energy

read

Energy
for your future

read

Works > Hydroelectric power station Navas (UD)

Hydroelectric power station Navas (UD)
Pelton 75 kW

Located in Comeglians (UD), with installed capacity of 75 kW

Year of project

2012

Location

Fontanon, Comeglians (UD) - Friuli Venezia Giulia, Italy

Water

Aqueduct

Description

1-nozzle horizontal-axis Pelton turbine

Net head (m)

345

Flow rate (l/s)

24

Turbine power (kW)

75 (rated power)

Lumiei Impianti guarantees the quality
of its installations at every level, from the smallest component
to the plant as a whole