Works > Hydroelectric power station Ex Bertoli (UD)

Hydroelectric power station Ex Bertoli (UD)
Kaplan 37 kW

Located in Molin Nuovo, Tavagnacco (UD), with installed capacity of 37 kW: restoration of the electromechanical equipment at the power station and connection to the national grid

Year of project

2011-2012

Location

Molin Nuovo, Tavagnacco (UD) - Friuli Venezia Giulia, Italy

Water

Udine canal

Description

Horizontal-axis Kaplan turbine with double adjustment

Net head (m)

2,35

Flow rate (l/s)

1.083

Turbine power (kW)

37 (rated power)