Operating office: Via Comunità Carnica 7, 33029 Villa Santina UD . t. +39 0433 86075 . info@lumieimpianti.com
Works > Hydroelectric power station Fanaco1 (Ag)
Hydroelectric power station Fanaco1 (Ag)
Francis 200 kW
Located in Cammarata (AG), with an installed capacity of 200 kW: construction and installation of electromechanical equipment for the production workshop and the intake system.
Year of project
2017
Location
Cammarata (AG), Italy
Water
Description
Horizontal Francis turbine
Net head (m)
34
Flow rate (l/s)
600
Turbine power (kW)
200